== Introduction ==
+
= Pandemic-Resilient and Sustainable Transmission and Distribution (T&D) Systems =
 
 
 
[[File:Pandemic Summary.png|frame|left|Pandemic Summary]]
 
[[File:Pandemic Summary.png|frame|left|Pandemic Summary]]
  
This is the home page of the EPRI Project Member of Pandemic-Resilient and Sustainable Transmission and Distribution (T&D) Systems - WS2 Control Center Design project.
+
This is the home page of the EPRI supplemental project - Pandemic-Resilient and Sustainable Transmission and Distribution (T&D) Systems. This project was developed by EPRI and funded by members with focus on eight workstreams.
In 2021 the project aims and deliverables are:  
+
WS1: Health and Disinfection
 
+
WS2: Control Center Strategies
'''2-11 Identify and document a summary of the leading practices, procedures, mitigations for pandemic response'''
+
WS3: Field Crew Strategies
 +
WS4: Operator and Field Crew Training
 +
WS5: Demand and Operations Impacts
 +
WS6: Deferred Work and Resource Adequacy
 +
WS7: Long-Term Demand and Sustainability
 +
WS8: Asset Management Strartegies
 +
EPRI project managers will release deliverables associated with each workstream in 2021 and 2022.
  
'''2-12 Identify and document enhanced design requirements for primary and backup control centers for pandemic operations'''
+
==WS2 Control Center Design project==
 +
The deliverables associated with workstream 2 - control center strategies are in the format of regularly updated web pages.  The aim is to keep these web pages updated as regularly as possible and at a minimum once every quearter as new information emerges about the pandemic, strategies are formulated and tested and new control center designs emerge.   
  
The project will run in 2021 and deliverables and information will be available to members via this webpage
+
== WS2 Project Deliverables ==
 +
The most recent deliverable web pages are shown below. Please click to browse and interact with the content.
 +
If you would like some further information, or if there is an issue with the content, please contact the WS2 project manager Adrian Kelly (akelly@epri.com) or the overall project manager Paul Myrda (pmyrda@epri.com)
  
== Project Tasks ==
+
* [[Pandemic/2-11CCGuidelines|2-11 Identify and document a summary of the leading practices, procedures, mitigations for pandemic response]]
* [[2-11 Identify and document a summary of the leading practices, procedures, mitigations for pandemic response | 2- 11 Practices and Procedures]]
+
* [[Pandemic/2-12CCDesigns|2-12 Identify and document enhanced design requirements for primary and backup control centers for pandemic operations]]
* [[2-12 Identify and document enhanced design requirements for primary and backup control centers for pandemic operations | 2-12 Control Center Designs]]
 

Revision as of 05:25, 26 October 2021

Pandemic-Resilient and Sustainable Transmission and Distribution (T&D) Systems

Pandemic Summary

This is the home page of the EPRI supplemental project - Pandemic-Resilient and Sustainable Transmission and Distribution (T&D) Systems. This project was developed by EPRI and funded by members with focus on eight workstreams. WS1: Health and Disinfection WS2: Control Center Strategies WS3: Field Crew Strategies WS4: Operator and Field Crew Training WS5: Demand and Operations Impacts WS6: Deferred Work and Resource Adequacy WS7: Long-Term Demand and Sustainability WS8: Asset Management Strartegies EPRI project managers will release deliverables associated with each workstream in 2021 and 2022.

WS2 Control Center Design project

The deliverables associated with workstream 2 - control center strategies are in the format of regularly updated web pages. The aim is to keep these web pages updated as regularly as possible and at a minimum once every quearter as new information emerges about the pandemic, strategies are formulated and tested and new control center designs emerge.

WS2 Project Deliverables

The most recent deliverable web pages are shown below. Please click to browse and interact with the content. If you would like some further information, or if there is an issue with the content, please contact the WS2 project manager Adrian Kelly (akelly@epri.com) or the overall project manager Paul Myrda (pmyrda@epri.com)